Calendar of Events

HOUSTON DRAW (UNIT 5A)

Date
06.28.2024 - 06.30.2024
Location
HOUSTON DRAW (UNIT 5A)

Description

Continued work on completing a meadow restoration project by installing  Zeedyk structures. These are erosion control structures that use rock and log placement to slow down flow of water through meadow. We use structures such as one rock dams, rock mulch rundowns, zuni bowls, log sills, and log weirs. We will also be building exclosure fences,  and moving a trail out of the meadow and rerouting it through the forest.

Location information

AES Logo Bronze

Arizona's conservation leader